America’s Choice High School

    Client: Sacramento City Unified School District

    Location: 10101 Systems Parkway, Sacramento

    Category: Education


Unique Features:

  • A complete team effort between the Owner, Design Team, Contractor, and DSA.
  • Constructed in less than 18 months.
  • Designed in 2 phases with a reuse of the plans for the Multi-Purpose Building.

Professional Services:

  • Assist in site acquisition
  • Programming
  • Participated in stake holder meeting
  • Construction Documents
  • Construction Administration
  • DSA Close-out and certification

Description
This ground-up campus encompassing 55,534 square feet on almost 13 acres was constructed as a “Small High School” focused learning environment.  The campus was designed to support a maximum of 500 students..